One Down
We have one wall totally bricked! And does it look good! Two others, facing 81, have about 1/3 of their brick on.

With the mild weather we had on Saturday, Bob TerBush was able to finish the very front wall, albeit under some flood lights.

Inside we were able to frame 80% of the structural support for our accordion doors (which will divide off the classrooms, or can be pushed back to have one large open room), continue to run wiring for the fire alarm and phone, attach 2x2 furring strips on the old brick wall by the stairwell to support drywall, support the water line through the existing building, and modify the framing to accommodate the furnace system. All of these steps, except for the brick work, are to prepare us for insulating the building.
Our next workday will be Saturday, December 23rd.

With the mild weather we had on Saturday, Bob TerBush was able to finish the very front wall, albeit under some flood lights.

Inside we were able to frame 80% of the structural support for our accordion doors (which will divide off the classrooms, or can be pushed back to have one large open room), continue to run wiring for the fire alarm and phone, attach 2x2 furring strips on the old brick wall by the stairwell to support drywall, support the water line through the existing building, and modify the framing to accommodate the furnace system. All of these steps, except for the brick work, are to prepare us for insulating the building.
Our next workday will be Saturday, December 23rd.